Heating and Ventilating

 

Briggs & Forrester completes college project

Briggs & Forrester has completed phase 2 of an extension project at the Booth Lane Campus at Northampton College.
Phase 1 of the project was completed in May last year and allowed students to gain access to the part of the £70m college completed in partnership with SDC Builders. Now the extension is complete the entire site is open again.

For the second and final phase of the project, Briggs & Forrester Engineering Services designed and installed all mechanical, electrical and public health services, including IT/data and security and fire alarm systems, to accompany the services from phase 1.



Follow HVROnlineEditor on Twitter
10 December 2012

Comments

Already Registered?
Login
Not Yet Registered?
Register

Engineer shortage threatens UK's ability to combat future overheating

The UK will not be able to stop the majority of its homes and infrastructure from overheating by 2050, unless something is done to address the skills gap in its air conditioning industry. That’s the view of Chris White – head of air conditioning and ...

  04-Jun-2026

Manchester Piccadilly Station – keeping water & rail service running

Operated and managed by Network Rail, Manchester Piccadilly Railway Station serves as the principal gateway to the Northwest and primary base for several train operating companies, including Avanti West Coast, TransPennine Express, Northern, and ...

  04-Jun-2026

STOKVIS R600

CONDENSING ULTRA LOW NOx PREMIX COMMERCIAL BOILER
  10-Jan-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary

HVR Awards 2026
https://www.heatingandventilating.net/briggs-forrester-completes-college-project