SEARCH

Nuaire wins environmental accolade

Nuaire has won the Go-Green environmental award at the Institute of Welsh Affairs Business Awards.
In a ceremony held at Cardiff City Hall, Nuaire was recognised for its wide-ranging and ongoing environmental strategy, including its significant reductions in waste and energy use and the increased efficiency of its plant.

Now in their second year, the awards, sponsored by PwC, showcase the best of Welsh business recognising their successes and achievements. The judges were particularly impressed with Nuaire's commitment to carbon and waste reduction at its plant.

Various measures have been implemented to address the company's green agenda, including the upgrade of its boiler systems, the introduction of daylight and motion sensor lighting and the installation of timers into the plant's own ventilation system.

In addition, during the last 12 months Nuaire has successfully achieved an 18% reduction in waste to landfill, recycled 93% of the 988 tonnes of waste produced and introduced smart metering to identify and remedy energy hotspots.

Mark Huxtable, managing director at Nuaire, said: 'We are delighted with our achievements to reduce waste and carbon emissions in the last 12 months, and this award is the perfect recognition for the efforts we have made.'



Follow HVROnlineEditor on Twitter
19 November 2012

Comments

Already Registered?
Login
Not Yet Registered?
Register

Xylem supports operation to make Whaley Bridge dam safe

A major disaster was narrowly averted in an operation to prevent the collapse of the dam wall at Toddbrook Reservoir in Whaley Bridge. Xylem Water Solutions UK provided pumps to drain the water and its rapid engineering response ensured a successful ...

  21-Aug-2019

Gilberts thermal control

How do you balance the need to prevent wasted energy, and ensure occupants are comfortable, without having to spend money and time connecting ventilation to building management systems? Gilberts Blackpool has an answer....

  21-Aug-2019

Gastite CSST

A wide range of CSST, fittings and accessories are available for projects both large and small. Suitable for all three family gases, the CSST range includes sizes DN15 to DN50 in a choice of lengths. Custom lengths are available for large/multi-family projects. Contractor kits, which include a length of CSST, and two male fittings are also available. Gastite® high-performance XR2™ fittings have a patented Jacket-Lock® fitting which eliminates exposed steel beyond the nut. The range includes male and female fittings, tees, copper compression fittings and couplings. Accessories designed to make installation even easier are also available and include; cutters, utility knives and jacket repair tape.
  12-Aug-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary