Know what you want? Try our 'Supplier Directory' 

Holiday Inn gets Mikrofill plant upgrade

Following an in depth site survey at The Holiday Inn hotel in Bromsgrove by William Austin’s, it was concluded that the LPHW plant urgently needed replacing. Part of the remedial programme included the supply of new boiler and hot water generation plant by Mikrofill.

Specifically 4 No Ethos 130 kW wall-mounted condensing boilers c/w a Mikrovent 750low loss header & air/dirt separator were skilfully installed by William Austin’s. The works had to coincide with a tight schedule ensuring complete continuity of the hotels services. The new boiler plant with a combined modulation of 40 : 1 (520 kW to 13 kW) supplies LPHW to the pool, spa and public areas throughout the hotel.

In addition, the HWS circuit was also upgraded with the installation of 2 No Extreme 500 litre loading cylinders capable of producing in excess of 5,000 litres p/hr at 60°C. The HWS loading cylinder maximises the efficiency of the Ethos condensing boilers as the Extremes integral plate heat exchanger operates at a Delta t 30°C (80/50°C) whilst producing a total instantaneous performance of 70 l/m at 60°C.

For more information on these and other Mikrofill products please call the sales team on 03452 606020 or visit www.mikrofill.com

9 June 2021

Comments

Already Registered?
Login
Not Yet Registered?
Register

Engineer shortage threatens UK's ability to combat future overheating

The UK will not be able to stop the majority of its homes and infrastructure from overheating by 2050, unless something is done to address the skills gap in its air conditioning industry. That’s the view of Chris White – head of air conditioning and ...

  04-Jun-2026

Manchester Piccadilly Station – keeping water & rail service running

Operated and managed by Network Rail, Manchester Piccadilly Railway Station serves as the principal gateway to the Northwest and primary base for several train operating companies, including Avanti West Coast, TransPennine Express, Northern, and ...

  04-Jun-2026

STOKVIS R600

CONDENSING ULTRA LOW NOx PREMIX COMMERCIAL BOILER
  10-Jan-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary

HVR Awards 2026