SEARCH

FoE hits out at 'scandalous' decarbonisation target delay threat

Friends of the Earth has slammed potential decarbonisation target delays as 'scandalous'.
Reacting to reports that a commitment on a target to decarbonise the power sector may be delayed until after the General Election, Friends of the Earth's executive director Andy Atkins said: 'It would be scandalous if Ed Davey threw in the towel over energy decarbonisation - he mustn't do George Osborne's dirty work.

'Delaying decarbonisation targets until after the next election is like an alcoholic pledging to give up drinking - but not today. We need urgent action now to end our economy's addiction to dirty and increasingly expensive fossil fuels.

'If the Liberal Democrats fail to keep their promise to include power sector decarbonisation in the Energy Bill their credibility will be in tatters.

'MPs from all parties must fight hard to ensure the Energy Bill has a clear plan for meeting UK climate targets.'


Follow HVROnlineEditor on Twitter
19 November 2012

Comments

Already Registered?
Login
Not Yet Registered?
Register

Xylem supports operation to make Whaley Bridge dam safe

A major disaster was narrowly averted in an operation to prevent the collapse of the dam wall at Toddbrook Reservoir in Whaley Bridge. Xylem Water Solutions UK provided pumps to drain the water and its rapid engineering response ensured a successful ...

  21-Aug-2019

Gilberts thermal control

How do you balance the need to prevent wasted energy, and ensure occupants are comfortable, without having to spend money and time connecting ventilation to building management systems? Gilberts Blackpool has an answer....

  21-Aug-2019

Gastite CSST

A wide range of CSST, fittings and accessories are available for projects both large and small. Suitable for all three family gases, the CSST range includes sizes DN15 to DN50 in a choice of lengths. Custom lengths are available for large/multi-family projects. Contractor kits, which include a length of CSST, and two male fittings are also available. Gastite® high-performance XR2™ fittings have a patented Jacket-Lock® fitting which eliminates exposed steel beyond the nut. The range includes male and female fittings, tees, copper compression fittings and couplings. Accessories designed to make installation even easier are also available and include; cutters, utility knives and jacket repair tape.
  12-Aug-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary