Heating and Ventilating

 

Ideal Heating launches new Imax Xtra 2 cascade installation video, proving powerful output doesn’t have to mean long build times

New from Ideal Commercial Heating, an installation video designed specifically for contractors and commercial heating engineers who want to see just how fast a high-performance cascade system can come together.

The video follows the assembly of three 80kW Imax Xtra 2 floor standing commercial condensing boilers in real time, demonstrating a complete build from first part to final connection, ultimately achieving up to 840kW of heating capacity in under 90 minutes.

Rather than a traditional product overview, the video focuses squarely on the practical on-site assembly experience. Every step is time-stamped, showing the installers’ progress as they position the wheeled boilers, align them using the prefabricated header kits, and hydraulic separation. The end result is a fully built three-boiler cascade assembled more quickly than many expect from a floor standing commercial system. The Imax Xtra 2’s compact footprint enabling it to fit through standard doorways, along with being fitted with wheels as standard, are key contributors to the speed of the installation, along with fast unpacking via fully recyclable packaging and the lack of requirement for specialist tools.

The Imax Xtra 2 range spans 80kW to 280kW models, all offering Class 6 NOx performance and the option to cascade up to four boilers for a total output of 1120kW. Hydraulic separation is available via plate heat exchangers, low loss headers or magnetic low loss headers, allowing system protection to be configured to suit the application. The boilers also feature a full-colour touchscreen for straightforward setup, commissioning and servicing.

To simplify specification further, Ideal Commercial Heating also provides an Imax Xtra 2 Cascade Configurator – an online tool that allows contractors to design the optimal cascade in minutes. By answering a few project-specific questions, users receive a complete component list that can be downloaded as a PDF or emailed directly, helping ensure all required parts are ordered first time.

Free commissioning by experienced Ideal Commercial Heating engineers is available on Imax Xtra 2 boilers, ensuring the system is correctly set up, and saving installers time. When conducted within three months of installation, an additional five-year warranty is applied at no extra cost. The heat exchanger is also covered by a five-year warranty, subject to terms and conditions.

Ideal Commercial Heating continues to develop high-efficiency commercial heating solutions built around the needs of modern plant rooms and the professionals who install them.

For more information and to watch the new video, go to https://idealcommercialboilers.com/news/powerful-output-built-in-under-90-minutes

4 February 2026

Comments

Already Registered?
Login
Not Yet Registered?
Register

CIPHE launches new guide to support industry shift to low-temperature heating

The Chartered Institute of Plumbing and Heating Engineering (CIPHE) has launched a new technical guide, ‘An Introduction to Low-Temperature Hydronic Heating Systems’, supporting the industry’s transition to lower-temperature, more energy-efficient ...

  04-Feb-2026

Adveco introduces the Astute® range of Intelligent Commercial Gas Water Heaters

The Astute® range of intelligent commercial gas water heaters has been developed exclusively for the UK market. Astute features five water connections on the top, back, and front of the units, along with versatile flueing for ease of installation, ...

  04-Feb-2026

STOKVIS R600

CONDENSING ULTRA LOW NOx PREMIX COMMERCIAL BOILER
  10-Jan-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary

https://www.heatingandventilating.net/ideal-heating-launches-new-imax-xtra-2-cascade-installation-video-proving-powerful-output-doesnt-have-to-mean-long-build-times