Heating and Ventilating

 

GDL supplies internal grilles and louvres at Gainsborough Hotel and Spa

The Gainsborough Hotel opened its doors in July 2015 after a highly anticipated wait. It is the first luxury five-star hotel and spa to open in Bath in 30 years.

The Gainsborough Hotel opened its doors in July 2015 after a highly anticipated wait. It is the first luxury five-star hotel and spa to open in Bath in 30 years.

Working alongside M&E contractors Finning UK, GDL supplied its grilles, louvres and diffusers throughout the hotel and spa areas, for both supply and extract ventilation.

For more information visit www.grille.co.uk

To request a brochure (technical catalogue, Intelivent natural ventilation catalogue or the company’s architectural systems catalogue) email sales@grille.co.uk

1 February 2016

Comments

Already Registered?
Login
Not Yet Registered?
Register

New BESA guidance will ‘revolutionise building air quality’

The Building Engineering Services Association (BESA) has launched a new specification for ventilation hygiene as part of its ongoing efforts to minimise the risk posed by contaminated indoor air to human health and well-being....

  18-Apr-2024
ACR News

Vapac Electrode Boiler launched

As the exclusive Vapac distributor in the UK, Humidity Solutions has announced the launch of the NEW Vapac Electrode Boiler, which incorporates advanced technology to minimise water and energy wastage....

  18-Apr-2024

STOKVIS R600

CONDENSING ULTRA LOW NOx PREMIX COMMERCIAL BOILER
  10-Jan-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary

HVR Awards 2024
https://www.heatingandventilating.net/gdl-supplies-internal-grilles-and-louvres-at-gainsborough-hotel-and-spa