Know what you want? Try our 'Supplier Directory' 

Dravo deliver HVAC system for leading UK retail giant

A leading UK retail giant’s distribution centre, located in Milton Keynes is a state of the art facility and is one of the UK’s largest, covering a 45 acres site – the size of 12 football pitches.

The 940,000 sq ft building needed a suitable energy efficient HVAC system to match and Dravo were able to provide the ideal solution to meet the clients specific heating requirements for the low bay area and cooling for the temperature controlled zones, which was to contain racking for pharmaceutical products, by supplying 8 x AHU’s; GH indirect gas fired appliances complete with modulating low NOx burners and high velocity ductwork distribution system.

Combined heating and ventilation solutions have been on the market for many years. The technology has been developed to the point that they now offer optimum energy efficiency while improving air quality.

These systems rely on a degree of fresh air intake to operate. Dravo’s range of indirect gas-fired units, for example, provide both fresh and warm air in the building. Indirect fired units work on a patented air recirculation system which supplies the amount of fresh air required to meet the changing requirements of the building, while maintaining a constant supply of fresh air into the burner.

Since fresh air is delivered faster than it can escape by natural ventilation, these units slightly pressurise the air inside the building. Pressurisation causes the air to distribute evenly throughout, eliminating temperature stratification or ‘cold spots’ and ensuring every part of the building is usable at all times. Once optimum conditions have been reached, the system modulates the fresh air input and utilises up to 90% recirculated air for maximum economy.

When temperatures within the building change, a combined heating and ventilation system can respond very quickly, soon returning the interior to comfort conditions.

Heat recovery is fast becoming the norm for such ventilation systems, reducing both running costs and harmful CO2emissions into the atmosphere.

Dravo were able to develop bespoke heating, ventilation and cooling system solutions for the client by providing reliable, consistent and comfortable temperature inside all of the new distribution centre.

20 January 2022

Comments

Already Registered?
Login
Not Yet Registered?
Register

Too many still afraid to call out safety failings

Parts of the construction industry have changed since the Grenfell Tower disaster, but many people working in safety critical roles still feel unable to call out client failings, according to the campaigning journalist and author Peter Apps....

  08-May-2026

Letting solar thermal do the heavy lifting for hot water

In the transition toward a net-zero economy, commercial building operators often find themselves staring at a roof and a spreadsheet, trying to bridge the gap between ambitious carbon targets and practical spatial constraints. While the spotlight ...

  08-May-2026

STOKVIS R600

CONDENSING ULTRA LOW NOx PREMIX COMMERCIAL BOILER
  10-Jan-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary

HVR Awards 2026