Heating and Ventilating

 

Briggs and Forrester wins Canary Wharf Crossrail contract

Briggs and Forrester Engineering Services has won a contract to install the mechanical, electrical and public health services for the Canary Wharf Crossrail Station.
Briggs and Forrester wins Canary Wharf Crossrail contract
The works include electrical systems, cooling, lighting, drainage, power and pump systems.

Canary Wharf Contractors, part of Canary Wharf Group, awarded the contract and is designing and building the station box on behalf of Crossrail for a fixed price of £500m, with Canary Wharf Group contributing £150m.

The Canary Wharf station will be one of the largest across the new Crossrail network and is being constructed within the waters of North Dock. The station box is approximately the same size as One Canada Square laid on its side.

Canary Wharf Group is developing four levels of retail space above the station box and a spectacular roof-top park, which will be partially covered by an elegant, semi open-air timber lattice roof.

In March this year the contractors completed and handed over the lowest level of the station box to Crossrail, five months ahead of schedule and within budget, ready to receive the tunnel boring machines in 2013. After the tunnel boring machines have passed through, the contractors will fit out the station with work due to complete in 2015. Work continues to construct the levels sitting directly above the station box.


Follow HVROnlineEditor on Twitter
11 July 2012

Comments

Already Registered?
Login
Not Yet Registered?
Register

Schools strongly support heat decarbonisation, but barriers hinder progress – Baxi research

A survey conducted by Baxi of 200 state school estates managers, consultant engineers and M&E contractors has found that while enthusiasm for net zero and support for low carbon heating systems in schools is thriving, persistent barriers remain....

  01-May-2025

Ideal Heating Commercial takes extra care with the heat network at Huddersfield specialist housing development

Ideal Heating Commercial POD Heat Interface Units (HIUs) and Evomax 2 condensing boilers have been installed into Ash View Extra Care in Huddersfield as part of a heat network designed to heat the 50 one and two bedroom flats and communal areas, ...

  30-Apr-2025

STOKVIS R600

CONDENSING ULTRA LOW NOx PREMIX COMMERCIAL BOILER
  10-Jan-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary

HVR Awards
BESA Industry Awards
http://www.heatingandventilating.net/briggs-and-forrester-wins-canary-wharf-crossrail-contract