Know what you want? Try our 'Supplier Directory' 

Heat pump focussed CPD module

ELCO Heating Solutions has introduced a new CIBSE-approved CPD module, adding to its learning programme.

The new CPD introduces heat pump technology and focusses on how to effectively apply it to commercial projects. The module has been carefully designed to allow building services engineers to review the use of high efficiency heat pumps and maximise their potential, while it also addresses key considerations for the design stage of a project.

By reviewing the basic principles governing the vapour compression cycle and its inherent limitations, the CPD outlines how best to apply heat pump technology to a system. The presentation also discusses the advantages and disadvantages of commonly used refrigerants, while evaluating example schematics for new and existing commercial heating systems, with and without domestic hot water preparation.

Mark Ferris, UK specification manager, said: “As with any commercial project, performance on paper is not always reflected in a practical setting, so careful system design and commissioning are essential – and this CPD module is designed to assist engineers in delivering the best possible heat pump-led system for their clients.”

Access a web-based booking system at www.elco.co.uk/cpd. Alternatively, it can be presented at an engineer’s practice. Email enquiries@elco.co.uk

30 September 2021

Comments

Already Registered?
Login
Not Yet Registered?
Register

Schools strongly support heat decarbonisation, but barriers hinder progress – Baxi research

A survey conducted by Baxi of 200 state school estates managers, consultant engineers and M&E contractors has found that while enthusiasm for net zero and support for low carbon heating systems in schools is thriving, persistent barriers remain....

  01-May-2025

Ideal Heating Commercial takes extra care with the heat network at Huddersfield specialist housing development

Ideal Heating Commercial POD Heat Interface Units (HIUs) and Evomax 2 condensing boilers have been installed into Ash View Extra Care in Huddersfield as part of a heat network designed to heat the 50 one and two bedroom flats and communal areas, ...

  30-Apr-2025

STOKVIS R600

CONDENSING ULTRA LOW NOx PREMIX COMMERCIAL BOILER
  10-Jan-2019
Heating & Ventilating Review is the number one magazine in the HVAR industry. Don’t miss out, subscribe today!
Subcribe to HVR

Diary

HVR Awards
BESA Industry Awards